BRT Route C1A
Description:
Lateral support to cut slops along the BRT Route C1A
Client:
Main Contractor:
Quantity Surveyor:
Location:
Year:
Scope of Work:
Ethekwini Transport Authority: Go! Durban
Mdubane Joint Venture
Newlands, Durban
2021
This lateral support to cut slops along the BRT Route C1A, contract consists of:
960 Steel Anchors of between 6m and 12m long
3840m2 of 35MPa reinforced gunite and fabric drains
Contiguous piled wall consisting of 67No 600mm diameter piles with 134 ground anchors, 81m of capping beam and 486m2 of steel reinforced gunite and fabric drains.
Earthworks, in soft, intermediate and hard material
Cut to spoil = 14625m3
Cut to fill = 3315m3
Rockfill protection at toes of fills = 2500m3
Gabions = 220m3
Various subsoil drainage systems, culverts, kerbing and channelling.
Date taken: 08/07/2021