BRT Route C1A

Description:

Client:

Main Contractor:

Quantity Surveyor:

Location:

Year:

Scope of Work:

Lateral support to cut slops along the BRT Route C1A

Ethekwini Transport Authority: Go! Durban

Mdubane Joint Venture

Newlands, Durban

2021

This lateral support to cut slops along the BRT Route C1A, contract consists of: 


960 Steel Anchors of between 6m and 12m long

3840m2 of 35MPa reinforced gunite and fabric drains


Contiguous piled wall consisting of 67No 600mm diameter piles with 134 ground anchors, 81m of capping beam and 486m2 of steel reinforced gunite and fabric drains.


Earthworks, in soft, intermediate and hard material

Cut to spoil = 14625m3

Cut to fill = 3315m3

Rockfill protection at toes of fills = 2500m3

Gabions = 220m3

Various subsoil drainage systems, culverts, kerbing and channelling.

BRT Route C1A
BRT Route C1A

Date taken: 08/07/2021