
Pavilion Shopping Centre
Description:
Foundation Piling
Client:
Main Contractor:
Quantity Surveyor:
Location:
Year:
Scope of Work:
Pareto Limited
Mega Pile
MLC Quantity Surveyors
Westville, KwaZulu Natal
The project consisted of installing 55No. 450mm diameter piles inside the shopping centre and 45No piles between 450mm and 750mm outside the existing building. All piles where drilled to practical refusal.
Pavilion alteration and extension
Nov 2013
1/2
< Previous Contract