
Umhlatuzana River Bridge
Description:
Foundation Piling
Client:
Main Contractor:
Quantity Surveyor:
Location:
Year:
Scope of Work:
eThekweni Municipality
Icon Construction
Umhlatuza, KwaZulu Natal
2019
Emergency rehabilitation of the Umlatuzana river bridge east abutment, requiring the Installation of 39 ODEX piles. 24 installed vertically and 15 installed at a 1:8 rake.
Umhlatuzana River Bridge Rehabilitation
Damage to the Umhlatuzana River bridge caused by the torrential rain in Durban - April 2019
1/6
< Previous Contract