BRT Newlands

Description:

Client:

Main Contractor:

Project Engineer:

Quantity Surveyor:

Location:

Year:

Scope of Work:

Construction of a contiguous piled retaining wall & bulk earthworks

Ethekwini Transport Authority: Go! Durban

Mdubane Joint Venture

Newlands, Durban

2020

This   project required a 185m permanent lateral support system to retain a cantilever length ranging between 1.5m and 7.5m.

This   was achieved by installing 217 piles ranging between 400mm and 750mm in   diameter into hard shale. The full face of the retaining wall then received a   flush shotcrete finish.