top of page

Pavilion Shopping Centre

Description:

Client:

Main Contractor:

Project Engineer:

Quantity Surveyor:

Location:

Year:

Scope of Work:

Foundation Piling

Pareto Limited

Mega Pile

MLC Quantity Surveyors

Westville, KwaZulu Natal

The   project consisted of installing 55No. 450mm diameter piles inside the shopping   centre and 45No piles between 450mm and 750mm outside the existing building.   All piles where drilled to practical refusal.

bottom of page